Plumbing  ·  Level 5
Water Supply System III
Chapter 1: Install water storage cisterns, tanks and hot water storage vessels
📚 5 Topics
What you will be able to do

By the end of this chapter, you will be able to:

  • Determine the best location for water storage tanks by accurately reading and interpreting working drawings.
  • Mount storage tanks and hot water vessels correctly, following all job requirements and instructions.
  • Set out pipe positions precisely according to manufacturer’s instructions and building codes.
  • Cut pipes accurately to match pipe drawing specifications and job needs.
  • Bend pipes properly, considering the pipe type and job specifications.
  • Join pipes correctly by following manufacturer’s instructions.
  • Install pipe fittings and control valves safely and according to job requirements.
  • Conduct thorough and safe housekeeping following workplace procedures.

Mastering these skills ensures you can install water storage systems that work efficiently and safely, which is essential for providing reliable water supply in any building.

Water storage cisterns, tanks and hot water storage vessels form critical components of plumbing systems in Kenya, ensuring reliable water availability for domestic, commercial and institutional use. Proper installation of these storage units safeguards water quality, prevents contamination and supports efficient water management, especially in areas facing intermittent supply. Plumbing professionals require comprehensive knowledge of storage location considerations and mounting techniques suitable for different tank materials to deliver durable and compliant installations.

1.1 Storage location

Selecting an appropriate storage location is fundamental to the performance and longevity of water storage tanks and vessels. The location affects accessibility for maintenance, structural support requirements, exposure to environmental factors and potential contamination risks. In Kenya, site conditions vary widely from urban apartments to rural households, so plumbers must adapt storage location choices to local constraints and user needs.

1.1.1 Factors influencing storage location choice

Several factors influence the decision of where to locate a water storage tank or vessel:

  • Structural support availability: Tanks need stable foundations or platforms capable of bearing their full weight when filled. For example, in Nairobi apartments, rooftop tanks require reinforced concrete slabs to prevent structural damage.

  • Accessibility for maintenance: Storage units must be accessible for inspection, cleaning and repairs without requiring excessive dismantling or risk to personnel.

  • Protection from contamination: Locating tanks away from sewage lines, waste disposal areas or chemical storage reduces the risk of water contamination.

  • Sunlight exposure: Excessive direct sunlight increases water temperature, promoting algae growth and deterioration of plastic tanks. Shaded or insulated locations help maintain water quality.

  • Security considerations: In public or commercial buildings like schools or hospitals, tanks should be placed in secure areas to prevent vandalism or unauthorized access.

1.1.2 Indoor versus outdoor storage locations

Storage tanks can be installed indoors or outdoors, each with distinct considerations:

  • Indoor locations: Offer protection from weather and vandalism. Suitable for hot water vessels in hotels or hospitals where consistent temperature control is required. However, space constraints and ventilation must be addressed to prevent humidity-related damage.

  • Outdoor locations: Common in residential compounds and commercial premises where space is ample. Outdoor tanks require UV-resistant materials or coatings, and secure fencing if in public areas.

  • Example: A county government office in Kisumu installed outdoor polyethylene tanks on raised platforms with shading to prevent algae growth and facilitate gravity-fed water supply.

1.1.3 Height and gravity considerations

The elevation of storage tanks affects water pressure and distribution efficiency:

  • Elevated tanks: Positioned on rooftops or raised platforms to utilize gravity for water supply, reducing reliance on pumps. This is common in Nairobi residential buildings where electricity interruptions are frequent.

  • Ground-level tanks: Require pumping systems to distribute water, increasing complexity and energy costs but easier to maintain and inspect.

  • Height limitations: Structural capacity and safety regulations limit maximum tank height. Plumbing professionals must coordinate with structural engineers for high-rise buildings.

1.1.4 Proximity to water use points

Locating storage tanks close to points of water use minimizes pipe lengths, reducing pressure losses and installation costs. For example, hotel kitchens and laundry facilities benefit from dedicated tanks nearby to ensure consistent supply during peak demand. However, proximity must be balanced against contamination risks and space availability.

Practice Questions

  1. List and explain five factors that influence the choice of storage location for water tanks in Kenyan buildings. (10 marks)
  2. Discuss the advantages and disadvantages of indoor versus outdoor water storage tank installations. (10 marks)
  3. Explain how the elevation of a water storage tank affects water pressure and supply efficiency. (5 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒1.2 Storage tanks and hot water storage vessels mounting

Mounting water storage tanks and hot water vessels securely is essential to prevent structural failure, leaks and contamination. The mounting method depends on the tank material, size, location and intended use. Plumbing professionals must select and construct…

🔒1.3 Pipe cutting, bending and jointing

Pipe cutting, bending and jointing are fundamental skills for plumbing professionals installing water storage cisterns, tanks, and hot water vessels. In Kenya, plumbing systems must often adapt to complex building layouts and limited space, requiring precise p…

🔒1.4 Pipe fittings and control valve installation

Pipe fittings and control valves are vital components in water storage systems, directing flow and enabling maintenance. In Kenya’s plumbing sector, installing these correctly ensures system efficiency and sustainability, especially in institutions like banks…

🔒1.5 Housekeeping

In plumbing installations involving water storage cisterns, tanks, and hot water vessels, maintaining good housekeeping is essential to ensure safety, efficiency, and professional workmanship on site. In Kenya, where construction sites can be congested and sub…

Chapter Summary

This chapter covers the essential considerations and techniques for installing water storage cisterns, tanks, and hot water storage vessels. It begins by explaining the importance of selecting an appropriate storage location that ensures accessibility, structural support, and protection from contamination. Various types of storage tanks and vessels are then explored, including plastic tanks made of polyethylene, steel tanks, concrete tanks, masonry tanks, and insulated tanks, each with specific mounting requirements to guarantee durability and functionality. The chapter also details the processes involved in pipe cutting, bending, and jointing to achieve secure and leak-free connections. Installation of pipe fittings and control valves is addressed to maintain proper flow control and system efficiency. Finally, the chapter emphasizes the significance of good housekeeping practices during and after installation to ensure safety, cleanliness, and the longevity of the water storage system.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What are the key factors to consider when selecting a storage location for water tanks in a residential building? (3 marks)
  2. Identify three advantages of using plastic (PE) tanks over steel tanks for water storage. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with model answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Identify five factors to consider when selecting the location for installing a water storage cistern in a residential building in Nairobi. (4 marks)
  2. Explain the advantages of using polyethylene (PE) plastic tanks over steel tanks for water storage in a rural Kenyan hotel. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Select and Prepare Site for Water Storage Tank 1500mm x 1500mm

Plumbing · Level 5
Water Supply System III
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Select and prepare a flat, clean, and safe site of 1500mm x 1500mm for water storage tank installation.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Tape measureSand
Spirit levelPPEs (Safety boots, Gloves, Dustcoat)
Mallet
Shovel
Broom
Marking paint or chalk
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Tape measure1 Pc per Candidate
2Spirit level1 Pc per Candidate
3Mallet1 Pc per Candidate
4Shovel1 Pc per Candidate
5Broom1 Pc per Candidate
6Marking paint or chalk1 Pc per Candidate
7Sand0.05 m3 per Candidate
8PPEs (Safety boots, Gloves, Dustcoat)Full set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Site Selection and Preparation
Wore appropriate PPE in line with occupational safety and health requirements
(Award 1 mark for each PPE worn correctly or zero)
3
Used tape measure and marking tools to measure and mark out a 1500mm x 1500mm area accurately
(Award 1 mark for each correct measurement and marking point or zero)
5
Checked and ensured the site is level using spirit level
(Award 5 marks for accurate leveling or zero)
5
Cleared the site of debris, vegetation, and other obstructions ensuring cleanliness
(Award 4 marks for thorough site cleaning or zero)
4
Prepared the base by spreading and leveling sand evenly within the marked area
(Award 5 marks for correct sand spreading and leveling or zero)
5
Maintained proper housekeeping by cleaning tools and disposing waste properly
(Award 3 marks for proper housekeeping or zero)
3
Sub-Total25
PRODUCT CHECKLIST
Site dimensions measured and marked accurately at 1500mm x 1500mm
(Award 5 marks for accurate measurements or zero)
5
Site base is level within ±5mm tolerance
(Award 5 marks for correct leveling or zero)
5
Site is clean, free from debris and hazards
(Award 5 marks for cleanliness and safety or zero)
5
Sand base evenly spread and compacted to provide stable surface
(Award 5 marks for proper sand base preparation or zero)
5
Tools and materials stored properly after task completion
(Award 5 marks for correct storage or zero)
5
Sub-Total25
GRAND TOTAL50
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Installation of a 1000 litre plastic (PE) water storage tank on a concrete base

Plumbing · Level 5
Water Supply System III
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Install a 1000 litre plastic (PE) water storage tank securely on a 1200mm x 1200mm x 150mm concrete base with connected 50mm PVC outlet pipe and ball valve.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Hacksaw1000 litre plastic (PE) water storage tank
Pipe wrenchConcrete base 1200mm x 1200mm x 150mm
Tape measure50mm diameter PVC pipe
Screwdriver50mm diameter PVC elbow
Spirit level50mm diameter PVC ball valve
50mm diameter tank connector
Thread seal tape
Silicone sealant
PVC pipe clips
Sand
PPE (Safety boots, gloves, dust coat)
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
11000 litre plastic (PE) water storage tank1 Pc per Candidate
2Concrete base (pre-cast 1.2m x 1.2m x 0.15m)1 Pc per Candidate
350mm diameter PVC ball valve1 Pc per Candidate
450mm diameter tank connector (female threaded)1 Pc per Candidate
5Thread seal tape3 rolls per Candidate
6Silicone sealant1 tube per Candidate
7PVC pipe 50mm diameter (1.5 m length)1.5 m per Candidate
8PVC elbow 50mm diameter2 Pcs per Candidate
9PVC pipe clips 50mm4 Pcs per Candidate
10Sand (clean fine sand)Sufficient for bedding and leveling
11Personal Protective Equipment (PPE): Safety boots, gloves, dust coatFull gear per Candidate
12Hacksaw1 Pc per Candidate
13Pipe wrench1 Pc per Candidate
14Tape measure1 Pc per Candidate
15Screwdriver1 Pc per Candidate
16Spirit level1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and Safety Compliance
Wore appropriate PPE (safety boots, gloves, dust coat)
(Award 1 mark for each PPE worn or zero)
3
Selected and arranged tools and materials correctly before starting work
(Award 1 mark for each correct tool/material arranged, up to 3 marks)
3
Prepared and leveled the concrete base using sand bedding as per specification
(Award 4 marks for proper leveling and preparation or zero)
4
Sub-Total10
TASK 2: Installation of Plastic Water Storage Tank and Connections
Positioned the 1000 litre plastic tank squarely and securely on the prepared base
(Award 5 marks for correct positioning and stability or zero)
5
Measured, cut and deburred 50mm PVC pipe accurately as per drawing
(Award 4 marks for accurate measurement and clean cutting or zero)
4
Fitted tank connector tightly on tank outlet using thread seal tape and silicone sealant
(Award 5 marks for proper sealing and tight fitting or zero)
5
Connected 50mm PVC pipe with elbows and ball valve correctly using pipe clips
(Award 6 marks for correct connections and secure fixing or zero)
6
Checked alignment and levelness of pipe work using spirit level
(Award 3 marks for correct alignment and leveling or zero)
3
Tested installation for leaks and functionality
(Award 4 marks for successful leak-free operation or zero)
4
Cleaned work area and disposed of waste materials properly
(Award 3 marks for proper cleaning and waste disposal or zero)
3
Stored tools and leftover materials as per manufacturer's instructions
(Award 2 marks for proper storage or zero)
2
Sub-Total32
PRODUCT CHECKLIST
Tank positioned squarely and stably on 1200mm x 1200mm x 150mm concrete base
(Award 5 marks for correct positioning and stability or zero)
5
PVC pipe and fittings measured and cut accurately to 1500mm total length with correct bends
(Award 6 marks for accurate pipework dimensions or zero)
6
Tank connector and ball valve fitted without leaks and sealed properly
(Award 5 marks for leak-free, tight joints or zero)
5
Pipework aligned and fixed level using pipe clips as per drawing
(Award 4 marks for proper alignment and fixing or zero)
4
Completed installation free from defects and ready for use
(Award 8 marks for completeness and workmanship or zero)
8
Sub-Total28
GRAND TOTAL70
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Installation of a 1000 litre steel water storage tankPractical 3
🔒Construct a reinforced concrete water storage tank 2000mm x 1500mm x 1200mmPractical 4
🔒Build a masonry water storage tank 1500mm x 1000mm x 1200mmPractical 5
🔒Installation of a 1000L insulated water storage tank with thermal protection and mountingPractical 6
🔒Pipe cutting, bending and jointing for a 1500mm x 300mm water storage cistern connectionPractical 7
🔒Installation of pipe fittings and control valves on a 1200mm x 600mm water storage tank pipelinePractical 8
🔒Mounting of a Hot Water Storage Vessel 1500mm Height x 600mm DiameterPractical 9
🔒Integrate pipework with water storage tank as per working drawingPractical 10
Flashcards 19 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

17 more in this section.

Create a free account
Test Yourself 17 questions Start quiz ▾
0%
0 / 2
🔒

15 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Determine the best location for water storage tanks by accurately reading and interpreting working drawings.
  • Mount storage tanks and hot water vessels correctly, following all job requirements and instructions.
  • Set out pipe positions precisely according to manufacturer’s instructions and building codes.
  • Cut pipes accurately to match pipe drawing specifications and job needs.
  • Bend pipes properly, considering the pipe type and job specifications.
  • Join pipes correctly by following manufacturer’s instructions.
  • Install pipe fittings and control valves safely and according to job requirements.
  • Conduct thorough and safe housekeeping following workplace procedures.

Tick each one you can genuinely do.

Prove it — in the simulator

Sample simulation — try how the simulator works. A version built for this chapter's practical is coming.

Prepare Kenyan PilauLocked ▸

Free: practical guides, quick cards, workplace scenarios and more.

Now — are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.