Electrical Engineering  ·  Level 6
Electrical Machine Winding
Chapter 4: Perform electrical machine testing
📚 5 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • perform continuity tests accurately following IEC standards
  • carry out polarity tests correctly according to IEC standards
  • conduct insulation resistance tests accurately by IEC guidelines
  • perform voltage and current balance tests correctly following IEC standards
  • complete housekeeping activities properly to keep your work area clean and safe

Mastering these skills ensures that electrical machines work safely and efficiently, helping you become a confident and reliable technician in the trade.

Compiled by: Paul Nganga

Electrical machines are critical components in Kenya’s power generation, manufacturing, and industrial sectors. Testing these machines ensures their reliability, efficiency, and safety during operation. This chapter addresses the essential practices for performing electrical machine testing, focusing on safety, proper use of disassembling tools, and key electrical tests such as turns ratio, winding resistance, voltage, and current measurements. Mastery of these aspects safeguards personnel and equipment while providing accurate diagnostics for maintenance and troubleshooting.

4.1 Test equipment set up

A test is only as good as the way the instruments are prepared and connected. A meter set on the wrong range, a lead with a broken wire inside or a test point that is not clean can give a reading that looks right and is wrong, and a wrong reading leads to a wrong decision about the machine. Setting up the test equipment means choosing the instruments for the tests to be done, checking them, arranging the test area and connecting the instruments to the machine safely. This topic describes these steps. The parameters that are measured are covered under test parameters, and the tests themselves under types of tests.

Choosing the instruments

The instrument is chosen for the quantity to be measured and the value to be expected.

Quantity Instrument Points to check
Voltage Voltmeter or multimeter Range above the expected voltage, AC or DC function, category rating
Current Clamp meter or ammeter with current transformer Range above the expected current, true RMS for non-sinusoidal waveforms
Winding resistance Low-resistance ohmmeter or bridge A range that gives enough digits for small resistances
Continuity Multimeter continuity function or buzzer Supply isolated, leads checked
Insulation resistance Insulation resistance tester (megohmmeter) Test voltage suited to the machine, following the maker’s instructions
Turns ratio Turns ratio tester, or a voltmeter on two windings Test voltage within the winding rating
Speed Tachometer Suited to the speed range

Example of range selection: a motor is rated at 415 V and 22 A. The voltmeter chosen must have a range above 415 V, so a 600 V range is suitable and a 200 V range is not. A clamp meter with a 40 A range would show the full-load current of 22 A with good resolution, while a 400 A range would give a poor reading. An instrument is never used near the top of a range that is too small, because an unexpected rise in value can damage it.

Preparing the instruments

  1. Inspect the case, the leads and the probes for cracks, bare wire and loose plugs.
  2. Check that the instrument is in calibration by its label, and that the battery is charged.
  3. Test the meter on a known source or a known resistor to see that it reads correctly.
  4. Test the leads for continuity by touching the probe tips together on the ohm range. A reading above a few tenths of an ohm means a faulty lead or a dirty plug.
  5. For the insulation tester, perform its own self-check, as the maker describes.
  6. Zero or null the instrument where its type requires it, and note the lead resistance when measuring small resistances.

Preparing the machine and the test area

  • The machine is isolated from the supply, locked and tagged, and proved dead before any connection is made.
  • Windings are discharged by shorting them to earth after an insulation test, so that no charge remains.
  • The terminal box is opened, the links are removed so that each winding is tested alone, and the terminals are cleaned with a dry cloth.
  • The machine and the instruments are placed on a dry, clean bench or floor with enough lighting.
  • The test area is marked and unauthorised persons are kept out. Signs warn of a test in progress.
  • Earthing of the frame is checked before the machine is energised for any test with a supply.

Connecting the instruments

  1. Select the function and the highest range of the instrument before connecting.
  2. Connect the leads to the machine first and the supply or the instrument source afterwards.
  3. Connect voltmeters in parallel, and ammeters or clamp meters round one conductor of the circuit only.
  4. For an insulation test, connect one lead to the winding and the other to the frame, then raise the test voltage after the leads are secure.
  5. Reduce the range only when the reading is known to be small.
  6. After the test, switch the instrument off, disconnect the leads in the reverse order and return the machine links.

Setting up for tests with a supply

Where a test is made with the machine energised, such as a no-load run, the supply is taken through a protective device, the frame is earthed, the guards are fitted, the shaft is free to turn and the emergency stop is within reach. The person controlling the supply is in touch with the person at the machine.

A record is made of each instrument used, its serial number and its calibration date, so that the test results can be traced to a checked instrument.

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒4.2 Test parameters

Disassembling electrical machines for testing requires specialized tools and instruments to measure key parameters such as turns ratio, winding resistance, voltage, and current. Proper selection and handling of these tools ensure accurate results and prevent d…

🔒4.3 Types of tests

In electrical engineering practice, especially when testing electrical machines such as motors and generators, accurate recording of machine data is crucial for diagnosing performance, ensuring reliability, and planning maintenance. In Kenya, electrical engine…

🔒4.4 Documentation e.g. compiling test reports, etc.

Documentation is the written record of the test: what was tested, how, with what instruments, what was found and what is to be done next. A result that is not written down cannot be compared, checked or used later, and a machine that is returned to the custome…

🔒4.5 Housekeeping activities

Housekeeping is the practice of keeping the test area clean, orderly and safe. In a workshop where machines are tested, the test leads, the instruments and the machines under test are all around the technician, and clutter or dirt is a direct hazard: a loose l…

Chapter Summary

This chapter focused on the essential procedures and precautions involved in performing electrical machine testing. It began with an emphasis on safety measures that protect both personnel and equipment during testing operations. The chapter then detailed the various tools and equipment required for disassembling electrical machines, highlighting the importance of using the correct instruments. Recording machine data was covered extensively, including critical winding parameters such as turns ratio, winding resistance, voltage, and current, which are vital for accurate diagnostics. Further, the process of disassembling rotating machine parts was explained, ensuring careful handling to avoid damage. Important winding tests such as continuity, insulation resistance, voltage testing, and current balance were presented to assess machine condition comprehensively. Finally, the chapter addressed housekeeping practices with a focus on maintaining general cleanliness to ensure a safe and efficient work environment.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Which of the following is NOT a critical safety measure when performing electrical machine testing? (2 marks)
    a) Wearing insulated gloves
    b) Using faulty test leads
    c) Ensuring proper grounding
    d) Keeping the workspace dry

  2. Name three essential tools used for disassembling rotating electrical machines. (3 marks)

🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Describe five essential safety measures to observe when testing electrical machines at a bottling plant workshop. (4 marks)
  2. List four types of disassembling tools commonly used for electrical machines and explain their specific purpose. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Perform Safety Checks and Prepare Work Area for Electrical Machine Testing

Electrical Engineering · Level 6
Electrical Machine Winding
PRACTICAL ASSESSMENT
TIME: 3 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Inspect and prepare the work area and 3-phase induction motor 500mm x 400mm x 400mm for testing by performing safety checks and ensuring cleanliness before starting the tests.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
MultimeterSafety Boots
Insulation Resistance Tester (Megger)Safety Gloves
General Electrical Toolkit (Screwdrivers, Pliers, etc.)Safety Goggles
Cleaning BrushWarning Signage (Safety Labels)
Cleaning ClothsWork Area Floor Mat
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
13-phase Induction Motor 415 V, 50 Hz1 Pc per Candidate
2Multimeter1 Pc per Candidate
3Insulation Resistance Tester (Megger)1 Pc per 2 Candidates
4Safety Boots1 Set per Candidate
5Safety Gloves1 Pair per Candidate
6Safety Goggles1 Pc per Candidate
7Cleaning Cloths2 pcs per Candidate
8Cleaning Brush1 Pc per Candidate
9Warning Signage (Safety Labels)1 Set per Candidate
10General Electrical Toolkit (Screwdrivers, Pliers, etc.)1 Set per Candidate
11Work Area Floor Mat1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Safety Checks and Preparation
Wore personal protective equipment including safety boots, gloves, and goggles
(Award 2 marks for wearing all PPE correctly, 0 if missing any item)
2
Inspected the 3-phase induction motor for visible damage or defects
(Award 3 marks for thorough inspection identifying no or all defects)
3
Checked the work area for hazards and removed any obstructions or debris
(Award 3 marks for complete hazard removal and clear floor space)
3
Cleaned the motor's exterior and work area using brush and cloth to ensure cleanliness
(Award 3 marks for thorough cleaning with no dirt or dust remaining)
3
Placed safety signage around the work area to warn others
(Award 2 marks for correct and visible placement of signage)
2
Verified availability and functionality of testing tools before starting tests
(Award 2 marks for confirming tools like multimeter and megger are ready)
2
Ensured good housekeeping by placing floor mat and organizing tools neatly
(Award 2 marks for neat arrangement and use of floor mat)
2
Sub-Total17
PRODUCT CHECKLIST
Work area and induction motor prepared with no safety hazards, clean and organized
(Award 8 marks for full compliance with safety, cleanliness, and housekeeping standards)
8
Sub-Total8
GRAND TOTAL25
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Select and Use Disassembling Tools for Electrical Machine Preparation

Electrical Engineering · Level 6
Electrical Machine Winding
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Select and use appropriate disassembling tools to prepare a 3-phase induction motor 2.2 kW, 415 V for disassembly as per workshop safety standards.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Set of screwdrivers (flat and Phillips)PPE (safety gloves, goggles, safety boots)
Hammer (500g)Cleaning cloths
Bearing pullerLubricant spray
Circlip pliersInduction motor 3-phase, 415 V, 2.2 kW
Soft mallet
Spanners (8mm, 10mm, 13mm)
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Set of screwdrivers (flat and Phillips)1 set per Candidate
2Hammer (500g)1 per Candidate
3Bearing puller1 per 2 Candidates
4Circlip pliers1 per Candidate
5Soft mallet1 per Candidate
6Spanners (8mm, 10mm, 13mm)1 set per Candidate
7PPE (safety gloves, goggles, safety boots)1 set per Candidate
8Cleaning cloths3 pcs per Candidate
9Lubricant spray1 can per 3 Candidates
10Induction motor 3-phase, 415 V, 2.2 kW1 per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Selection and Use of Disassembling Tools
Wore full PPE including safety gloves, goggles and boots
(Award 2 marks if all PPE worn correctly, else 0)
2
Listed all necessary disassembling tools before starting
(Award 3 marks for complete and correct tool list)
3
Used screwdrivers and spanners correctly without damaging fasteners
(Award 4 marks for proper tool use and no damage)
4
Applied bearing puller and circlip pliers safely and effectively
(Award 4 marks for correct and safe use)
4
Used hammer and soft mallet appropriately without causing damage
(Award 3 marks for controlled and correct striking)
3
Maintained good housekeeping and cleaned work area before and after task
(Award 2 marks for clean, organized workspace)
2
Followed safety procedures during tool selection and usage
(Award 2 marks for adherence to safety protocols)
2
Sub-Total20
PRODUCT CHECKLIST
Tools selected match disassembly requirements and motor specifications
(Award 5 marks if all tools are appropriate and sufficient)
5
No visible damage caused to motor components during tool use
(Award 5 marks if motor parts intact and undamaged)
5
Work area left clean and organized post-preparation
(Award 3 marks for neatness and housekeeping)
3
Safety compliance observed throughout the task
(Award 2 marks for continuous safety compliance)
2
Sub-Total15
GRAND TOTAL35
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Disassemble the rotating parts of a 3-phase induction motor 1.5 kW, 1450 rpmPractical 3
🔒Record Electrical Machine and Winding Data for TestingPractical 4
🔒Measure and Interpret Transformer Turns RatioPractical 5
🔒Measure and Record Winding Resistance of a 3-Phase Induction Motor CoilPractical 6
🔒Perform voltage measurement tests on a 3-phase induction motorPractical 7
🔒Measure current and verify current balance in a 3-phase motor windingPractical 8
🔒Test continuity of electrical machine windingsPractical 9
🔒Perform Insulation Resistance Test on 3-Phase Induction Motor WindingsPractical 10
🔒Clean and maintain electrical machine components for operational readinessPractical 11
🔒Assemble Rotating Machine Parts After TestingPractical 12
🔒Prepare and document electrical machine test reports for a 3-phase induction motorPractical 13
🔒Interpretation of Electrical Machine Test Results for Condition AssessmentPractical 14
🔒Demonstrate proper handling and storage of electrical machine testing tools and equipmentPractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 18 questions Start quiz ▾
0%
0 / 2
🔒

16 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • perform continuity tests accurately following IEC standards
  • carry out polarity tests correctly according to IEC standards
  • conduct insulation resistance tests accurately by IEC guidelines
  • perform voltage and current balance tests correctly following IEC standards
  • complete housekeeping activities properly to keep your work area clean and safe

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.