Carpentry and Joinery  ·  Level 4
Temporary Works
Chapter 3: Construct and Erect Form work for Concrete Structures
📚 6 Topics
What you will be able to do

By the end of this chapter, you will be able to:

  • Select the right personal protective equipment (PPE) for the job and use it correctly to stay safe.
  • Follow safety procedures carefully while working with formwork.
  • Accurately measure and determine formwork dimensions based on the structural design.
  • Fit formwork components precisely to ensure the structure is strong and stable.

Mastering these skills helps you build safe, reliable concrete structures and keeps you and your team protected on the job.

Constructing and erecting formwork is a fundamental skill for carpentry and joinery professionals involved in concrete construction. Formwork serves as the temporary mould into which concrete is poured to achieve the desired shape and structural integrity. In Kenya, where infrastructure development is rapidly expanding, mastery of formwork materials and preparation techniques is essential for ensuring quality, safety, and efficiency on construction sites such as county government office buildings or private residential projects. This chapter focuses on identifying appropriate formwork materials and preparing them effectively for use in concrete structures.

3.1 Formwork Materials Formwork for

The selection and preparation of formwork materials directly influence the durability and finish of concrete structures. Proper materials ensure the formwork withstands the wet concrete’s pressure and maintains shape until the concrete gains sufficient strength. Kenyan carpenters working on projects like school classrooms or hospital wards must understand the properties and handling of different formwork materials to optimize resource use and reduce wastage. The following subtopics explore how to identify and prepare these materials for practical use.

3.1.1 Identify Formwork Materials

Formwork materials are chosen based on factors such as strength, durability, cost, availability, and the type of concrete structure being cast. In Kenya’s carpentry and joinery sector, knowledge of these materials helps professionals select the best option tailored to project requirements.

Types of Formwork Materials

  • Timber: Timber is the most common formwork material due to its availability and ease of customization. It offers a smooth finish and can be reused multiple times if properly maintained. For example, in constructing a retail shop in Nairobi, timber formwork allows for rapid adjustments on site.

  • Plywood: Plywood sheets provide a smooth surface finish and are widely used in formwork for slabs and walls. They are lightweight yet strong and can be treated to resist moisture, enhancing durability in Kenya’s humid coastal regions.

  • Steel: Steel formwork is durable and provides excellent strength, ideal for repetitive use in large-scale projects such as county hospitals. Though expensive initially, steel formwork reduces labour costs due to faster assembly and dismantling.

  • Plastic: Plastic formwork is lightweight and resistant to water damage, making it suitable for intricate shapes and small-scale constructions like residential foundations. Its reusability and ease of cleaning improve cost-efficiency.

  • Aluminium: Aluminium formwork combines lightness and strength, allowing easy handling and long service life. It is preferred in urban construction projects such as university buildings where speed and precision are critical.

Criteria for Selecting Formwork Materials

  • Load-bearing capacity: Materials must withstand the pressure of freshly poured concrete without deformation.
  • Surface finish quality: The choice affects the texture and appearance of the cured concrete surface.
  • Reusability: Durable materials like steel and aluminium can be reused multiple times, reducing overall costs.
  • Availability and cost: Locally available materials like timber are cost-effective but may have shorter lifespans.
  • Ease of handling and installation: Lightweight materials enable faster erection, important in tight project timelines.

3.1.2 Prepare Formwork Materials

Preparing formwork materials involves selecting, cutting, treating, and assembling components to ensure the structure’s integrity and safety before concrete pouring. Proper preparation minimizes defects such as leaks or misalignment that compromise concrete quality.

Process of Preparing Timber Formwork Materials

Timber remains the staple material for Kenyan carpenters due to its versatility and cost-effectiveness. Preparation involves several key steps:

  1. Selection of timber: Choose timber free from knots, splits, or warping to ensure strength and smooth finish. For example, for a SACCO office slab, selecting durable hardwoods like mahogany improves formwork life.
  2. Cutting and sizing: Accurately cut timber planks and battens to the required dimensions using circular saws or hand saws. Precision ensures proper fit and reduces gaps that cause concrete leakage.
  3. Surface treatment: Apply form oil or release agents to timber surfaces to prevent concrete adhesion, facilitating easy removal and reducing damage to the formwork.
  4. Strengthening and reinforcement: Use nails, screws, and brackets to assemble formwork panels securely, ensuring they resist concrete pressure during pouring.
  5. Inspection and repair: Check for defects or weak points in the timber and replace damaged sections prior to erection. This step is crucial in hospital construction where structural integrity is non-negotiable.

Preparing Plywood and Other Sheet Materials

  • Moisture conditioning: Treat plywood with preservatives or waterproof coatings to prevent swelling and degradation during concrete curing.
  • Cutting to size: Use power tools for clean edges to ensure tight joints and smooth concrete finishes.
  • Edge sealing: Apply sealants or tape along edges to avoid water ingress that can weaken the sheet.
  • Panel assembly: Fasten sheets onto supporting timber frames with appropriate fixings for stability.
  • Storage: Keep prepared sheets flat and off the ground to avoid warping before use.

Maintenance and Handling of Formwork Materials

  • Cleaning after use: Remove concrete residues promptly to extend material life, especially important for plywood and plastic.
  • Proper storage: Store materials in dry, shaded areas to prevent rot and rust.
  • Regular inspection: Before reuse, check for damage or wear to maintain safety standards.
  • Safe transportation: Handle materials carefully to avoid cracks or dents, particularly for steel and plastic panels.

Practice Questions

  1. Explain five criteria used to select appropriate formwork materials for a concrete slab in a county government office. (10 marks)
  2. Describe the process of preparing timber formwork materials for erecting a concrete wall, highlighting at least six key steps. (12 marks)
  3. Compare the advantages of using steel formwork versus timber formwork in the construction of a university building. (8 marks)
  4. Outline five maintenance practices necessary to extend the service life of plywood formwork materials. (10 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒3.2 Assembling and positioning formwork for construction elements (beams, columns, walls and slabs)

In the Kenyan carpentry and joinery sector, the assembly and positioning of formwork is a critical activity that determines the quality and safety of concrete structures. Formwork must be tailored to the specific construction element, whether beams, columns, w…

🔒3.3 Securing Formwork

Securing formwork effectively is critical in carpentry and joinery when constructing concrete structures. In the Kenyan construction sector, especially for projects like county government offices or retail buildings, improperly secured formwork can lead to str…

🔒3.4 Dimensions, Alignment and Plumb Levels

Ensuring accurate dimensions, alignment, and plumb levels is fundamental when constructing and erecting formwork for concrete structures. In Kenya's carpentry and joinery sector, these measurements guarantee that the concrete elements achieve the intended stru…

🔒3.5 Release Agents

In the construction of concrete structures, particularly in carpentry and joinery where formwork is used, the application of release agents plays a crucial role. Release agents prevent concrete from bonding to the formwork surfaces, ensuring easy removal witho…

🔒3.6 Housekeeping Practices Install and Secure

In the context of carpentry and joinery for formwork construction in Kenya, maintaining excellent housekeeping practices during installation and securing processes is crucial. Proper housekeeping ensures a safe working environment, reduces material wastage, an…

Chapter Summary

This chapter explored the essential materials used in formwork and the necessary preparation processes that ensure their suitability for concrete structures. It detailed the procedures for assembling and positioning formwork on various construction elements such as beams, columns, walls, and slabs, emphasizing the importance of selecting appropriate materials and conducting thorough safety checks. The securing of formwork was examined, including the selection and installation of support members to maintain structural integrity during concrete placement. Attention was given to interpreting working drawings accurately, utilizing proper tools and equipment to achieve correct dimensions, alignment, and plumb levels, and addressing any errors encountered. The chapter also covered the identification and application of release agents, outlining the preparation steps and inspection practices required to facilitate the removal of formwork without damaging the concrete. Finally, the importance of maintaining good housekeeping practices on site was highlighted to ensure a safe and efficient working environment throughout the formwork construction process.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Which of the following materials is most suitable for constructing formwork for concrete slabs? (2 marks)
    a) Plywood
    b) Mild steel
    c) Glass fibre
    d) Plastic sheets

  2. Describe the primary purpose of applying release agents on formwork surfaces. (3 marks)

🔒33 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with model answers

SECTION A (40 Marks) - Answer ALL Questions

  1. List five common materials used in carpentry formwork and explain why timber is preferred in Kenya for constructing formwork for concrete beams. (4 marks)
  2. Describe the steps involved in preparing formwork materials before assembling them on a construction site. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Identify and Prepare Formwork Materials for a Concrete Column

Carpentry and Joinery · Level 4
Temporary Works
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Identify and prepare formwork materials for a reinforced concrete column 300mm x 300mm x 1500mm high.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Marking gaugeSawn softwood timber 100mm x 50mm x 1500mm
Try squarePlywood sheets 6mm thick 1200mm x 1200mm
Claw hammer50 mm wire nails
HandsawSteel formwork ties
Woodworking plane
Spirit level
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Sawn softwood timber 100mm x 50mm x 1500mm4 pcs per Candidate
2Plywood sheets 6mm thick 1200mm x 1200mm1 sheet per Candidate
350 mm wire nails30 pcs per Candidate
4Steel formwork ties10 pcs per Candidate
5Marking gauge1 pc per Candidate
6Try square1 pc per Candidate
7Claw hammer1 pc per Candidate
8Handsaw1 pc per Candidate
9Woodworking plane1 pc per 2 Candidates
10Spirit level1 pc per Candidate
11Safety boots1 pair per Candidate
12Protective overall1 per Candidate
13Leather gloves1 pair per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Identify and Prepare Formwork Materials
Wore Personal Protective Equipment (Safety boots, Overall, Leather gloves)
(Award 1 mark for each PPE worn correctly or 0)
3
Assembled all required tools and materials before commencing work
(Award 2 marks if all tools and materials assembled or 0)
2
Measured and marked timber pieces accurately according to dimensions
(Award 1 mark for each correctly marked timber piece or 0)
3
Cut timber pieces to required sizes with precision
(Award 1 mark for each correctly cut timber piece or 0)
3
Planed timber pieces to smooth finish and correct dimensions
(Award 1 mark for each timber piece planed correctly or 0)
3
Checked timber pieces for defects and suitability for formwork use
(Award 2 marks if defects identified and unsuitable pieces rejected or 0)
2
Arranged prepared materials ready for formwork erection
(Award 2 marks for neat and correct arrangement or 0)
2
Sub-Total18
PRODUCT CHECKLIST
Formwork timber pieces cut to 1500mm length with 100mm x 50mm cross-section
(Award 3 marks if all pieces meet size specifications or 0)
3
Plywood sheet prepared and cut to 300mm x 300mm panels for column faces
(Award 3 marks if plywood panels are cut accurately or 0)
3
Timber surfaces planed smooth without splinters or rough edges
(Award 2 marks if smooth surfaces achieved or 0)
2
Materials free of visible defects such as knots, cracks, or warping
(Award 2 marks if materials are sound or 0)
2
Materials arranged neatly and ready for formwork assembly
(Award 2 marks for neat, organized materials or 0)
2
Sub-Total12
GRAND TOTAL30
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Identify construction elements and select formwork materials for concrete structures

Carpentry and Joinery · Level 4
Temporary Works
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Identify beams, columns, walls, and slabs from the given samples and select appropriate formwork materials for each element based on size and load requirements.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
PencilSample timber pieces
Tape measurePlywood sheets
Try squareSteel formwork panel sample
Steel props adjustable
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Pencil1 Pc per Candidate
2Tape measure (7.5m)1 Pc per Candidate
3Try square1 Pc per Candidate
4Sample timber pieces (100mm x 50mm x 500mm)4 Pcs per Candidate
5Plywood sheets (1200mm x 2400mm x 18mm)1 Sheet per 5 Candidates
6Steel formwork panel sample (600mm x 600mm)1 Pc per 5 Candidates
7Steel props adjustable (2m to 3m)1 Pc per 10 Candidates
8Safety boots1 Pair per Candidate
9Overall1 Pc per Candidate
10Helmet1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Identify construction elements and select formwork materials
Wore Personal Protective Equipment (Safety boots, Overall, Helmet)
(Award 1 mark for each PPE worn as per workplace procedures)
3
Assembled required tools and materials
(Award 1 mark each for tools and materials assembled)
2
Correctly identified beams from samples
(Award 3 marks if all beam samples correctly identified or 0)
3
Correctly identified columns from samples
(Award 3 marks if all column samples correctly identified or 0)
3
Correctly identified walls from samples
(Award 3 marks if all wall samples correctly identified or 0)
3
Correctly identified slabs from samples
(Award 3 marks if all slab samples correctly identified or 0)
3
Selected suitable formwork materials for beams
(Award 4 marks for correct material selection considering size and load or 0)
4
Selected suitable formwork materials for columns
(Award 4 marks for correct material selection considering size and load or 0)
4
Selected suitable formwork materials for walls
(Award 4 marks for correct material selection considering size and load or 0)
4
Selected suitable formwork materials for slabs
(Award 4 marks for correct material selection considering size and load or 0)
4
Sub-Total33
PRODUCT CHECKLIST
Accurate identification of beams, columns, walls, and slabs (4 elements x 2 marks)
(Award 2 marks for each element correctly identified)
8
Appropriate formwork material selection for each element (4 elements x 4 marks)
(Award 4 marks for each element with correct formwork material selected)
16
Overall neatness and organization of samples and selections
(Award up to 3 marks for neat and professional presentation)
3
Sub-Total27
GRAND TOTAL60
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Prepare materials for timber formwork assembly for a concrete beamPractical 3
🔒Assemble and Install Beam FormworkPractical 4
🔒Assemble and Install Column Formwork 300mm x 300mm x 1500mmPractical 5
🔒Assemble and Install Formwork Members for a 3m High Concrete WallPractical 6
🔒Assemble and Install Formwork for a Concrete Slab 3000mm x 3000mm x 150mmPractical 7
🔒Perform Safety Checks During Formwork InstallationPractical 8
🔒Select and Prepare Formwork Support Members for Concrete Beam FormworkPractical 9
🔒Install Support Members to Formwork for Concrete Beam 3000mm x 300mm x 500mmPractical 10
🔒Check and Adjust Formwork Dimensions, Alignment, and Plumb Levels for a Concrete ColumnPractical 11
🔒Interpret and Prepare Formwork for a Concrete Beam 4000mm x 300mm x 500mmPractical 12
🔒Identify and Prepare Release Agents for FormworkPractical 13
🔒Apply release agents uniformly on formwork for a concrete beamPractical 14
🔒Inspection and Housekeeping of Erected Formwork for Concrete Column 300mm x 300mm x 1500mmPractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Select the right personal protective equipment (PPE) for the job and use it correctly to stay safe.
  • Follow safety procedures carefully while working with formwork.
  • Accurately measure and determine formwork dimensions based on the structural design.
  • Fit formwork components precisely to ensure the structure is strong and stable.

Tick each one you can genuinely do.

Prove it — in the simulator

Sample simulation — try how the simulator works. A version built for this chapter's practical is coming.

Prepare Kenyan PilauLocked ▸

Free: practical guides, quick cards, workplace scenarios and more.

Now — are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.