By the end of this chapter, you will be able to:
Mastering these skills helps you build safe, reliable concrete structures and keeps you and your team protected on the job.
Constructing and erecting formwork is a fundamental skill for carpentry and joinery professionals involved in concrete construction. Formwork serves as the temporary mould into which concrete is poured to achieve the desired shape and structural integrity. In Kenya, where infrastructure development is rapidly expanding, mastery of formwork materials and preparation techniques is essential for ensuring quality, safety, and efficiency on construction sites such as county government office buildings or private residential projects. This chapter focuses on identifying appropriate formwork materials and preparing them effectively for use in concrete structures.
The selection and preparation of formwork materials directly influence the durability and finish of concrete structures. Proper materials ensure the formwork withstands the wet concrete’s pressure and maintains shape until the concrete gains sufficient strength. Kenyan carpenters working on projects like school classrooms or hospital wards must understand the properties and handling of different formwork materials to optimize resource use and reduce wastage. The following subtopics explore how to identify and prepare these materials for practical use.
Formwork materials are chosen based on factors such as strength, durability, cost, availability, and the type of concrete structure being cast. In Kenya’s carpentry and joinery sector, knowledge of these materials helps professionals select the best option tailored to project requirements.
Timber: Timber is the most common formwork material due to its availability and ease of customization. It offers a smooth finish and can be reused multiple times if properly maintained. For example, in constructing a retail shop in Nairobi, timber formwork allows for rapid adjustments on site.
Plywood: Plywood sheets provide a smooth surface finish and are widely used in formwork for slabs and walls. They are lightweight yet strong and can be treated to resist moisture, enhancing durability in Kenya’s humid coastal regions.
Steel: Steel formwork is durable and provides excellent strength, ideal for repetitive use in large-scale projects such as county hospitals. Though expensive initially, steel formwork reduces labour costs due to faster assembly and dismantling.
Plastic: Plastic formwork is lightweight and resistant to water damage, making it suitable for intricate shapes and small-scale constructions like residential foundations. Its reusability and ease of cleaning improve cost-efficiency.
Preparing formwork materials involves selecting, cutting, treating, and assembling components to ensure the structure’s integrity and safety before concrete pouring. Proper preparation minimizes defects such as leaks or misalignment that compromise concrete quality.
Timber remains the staple material for Kenyan carpenters due to its versatility and cost-effectiveness. Preparation involves several key steps:
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter explored the essential materials used in formwork and the necessary preparation processes that ensure their suitability for concrete structures. It detailed the procedures for assembling and positioning formwork on various construction elements such as beams, columns, walls, and slabs, emphasizing the importance of selecting appropriate materials and conducting thorough safety checks. The securing of formwork was examined, including the selection and installation of support members to maintain structural integrity during concrete placement. Attention was given to interpreting working drawings accurately, utilizing proper tools and equipment to achieve correct dimensions, alignment, and plumb levels, and addressing any errors encountered. The chapter also covered the identification and application of release agents, outlining the preparation steps and inspection practices required to facilitate the removal of formwork without damaging the concrete. Finally, the importance of maintaining good housekeeping practices on site was highlighted to ensure a safe and efficient working environment throughout the formwork construction process.
Which of the following materials is most suitable for constructing formwork for concrete slabs? (2 marks)
a) Plywood
b) Mild steel
c) Glass fibre
d) Plastic sheets
Describe the primary purpose of applying release agents on formwork surfaces. (3 marks)
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Marking gauge | Sawn softwood timber 100mm x 50mm x 1500mm |
| Try square | Plywood sheets 6mm thick 1200mm x 1200mm |
| Claw hammer | 50 mm wire nails |
| Handsaw | Steel formwork ties |
| Woodworking plane | |
| Spirit level |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Sawn softwood timber 100mm x 50mm x 1500mm | 4 pcs per Candidate |
| 2 | Plywood sheets 6mm thick 1200mm x 1200mm | 1 sheet per Candidate |
| 3 | 50 mm wire nails | 30 pcs per Candidate |
| 4 | Steel formwork ties | 10 pcs per Candidate |
| 5 | Marking gauge | 1 pc per Candidate |
| 6 | Try square | 1 pc per Candidate |
| 7 | Claw hammer | 1 pc per Candidate |
| 8 | Handsaw | 1 pc per Candidate |
| 9 | Woodworking plane | 1 pc per 2 Candidates |
| 10 | Spirit level | 1 pc per Candidate |
| 11 | Safety boots | 1 pair per Candidate |
| 12 | Protective overall | 1 per Candidate |
| 13 | Leather gloves | 1 pair per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Identify and Prepare Formwork Materials | |||
| Wore Personal Protective Equipment (Safety boots, Overall, Leather gloves) (Award 1 mark for each PPE worn correctly or 0) | 3 | ||
| Assembled all required tools and materials before commencing work (Award 2 marks if all tools and materials assembled or 0) | 2 | ||
| Measured and marked timber pieces accurately according to dimensions (Award 1 mark for each correctly marked timber piece or 0) | 3 | ||
| Cut timber pieces to required sizes with precision (Award 1 mark for each correctly cut timber piece or 0) | 3 | ||
| Planed timber pieces to smooth finish and correct dimensions (Award 1 mark for each timber piece planed correctly or 0) | 3 | ||
| Checked timber pieces for defects and suitability for formwork use (Award 2 marks if defects identified and unsuitable pieces rejected or 0) | 2 | ||
| Arranged prepared materials ready for formwork erection (Award 2 marks for neat and correct arrangement or 0) | 2 | ||
| Sub-Total | 18 | ||
| PRODUCT CHECKLIST | |||
| Formwork timber pieces cut to 1500mm length with 100mm x 50mm cross-section (Award 3 marks if all pieces meet size specifications or 0) | 3 | ||
| Plywood sheet prepared and cut to 300mm x 300mm panels for column faces (Award 3 marks if plywood panels are cut accurately or 0) | 3 | ||
| Timber surfaces planed smooth without splinters or rough edges (Award 2 marks if smooth surfaces achieved or 0) | 2 | ||
| Materials free of visible defects such as knots, cracks, or warping (Award 2 marks if materials are sound or 0) | 2 | ||
| Materials arranged neatly and ready for formwork assembly (Award 2 marks for neat, organized materials or 0) | 2 | ||
| Sub-Total | 12 | ||
| GRAND TOTAL | 30 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Pencil | Sample timber pieces |
| Tape measure | Plywood sheets |
| Try square | Steel formwork panel sample |
| Steel props adjustable |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Pencil | 1 Pc per Candidate |
| 2 | Tape measure (7.5m) | 1 Pc per Candidate |
| 3 | Try square | 1 Pc per Candidate |
| 4 | Sample timber pieces (100mm x 50mm x 500mm) | 4 Pcs per Candidate |
| 5 | Plywood sheets (1200mm x 2400mm x 18mm) | 1 Sheet per 5 Candidates |
| 6 | Steel formwork panel sample (600mm x 600mm) | 1 Pc per 5 Candidates |
| 7 | Steel props adjustable (2m to 3m) | 1 Pc per 10 Candidates |
| 8 | Safety boots | 1 Pair per Candidate |
| 9 | Overall | 1 Pc per Candidate |
| 10 | Helmet | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Identify construction elements and select formwork materials | |||
| Wore Personal Protective Equipment (Safety boots, Overall, Helmet) (Award 1 mark for each PPE worn as per workplace procedures) | 3 | ||
| Assembled required tools and materials (Award 1 mark each for tools and materials assembled) | 2 | ||
| Correctly identified beams from samples (Award 3 marks if all beam samples correctly identified or 0) | 3 | ||
| Correctly identified columns from samples (Award 3 marks if all column samples correctly identified or 0) | 3 | ||
| Correctly identified walls from samples (Award 3 marks if all wall samples correctly identified or 0) | 3 | ||
| Correctly identified slabs from samples (Award 3 marks if all slab samples correctly identified or 0) | 3 | ||
| Selected suitable formwork materials for beams (Award 4 marks for correct material selection considering size and load or 0) | 4 | ||
| Selected suitable formwork materials for columns (Award 4 marks for correct material selection considering size and load or 0) | 4 | ||
| Selected suitable formwork materials for walls (Award 4 marks for correct material selection considering size and load or 0) | 4 | ||
| Selected suitable formwork materials for slabs (Award 4 marks for correct material selection considering size and load or 0) | 4 | ||
| Sub-Total | 33 | ||
| PRODUCT CHECKLIST | |||
| Accurate identification of beams, columns, walls, and slabs (4 elements x 2 marks) (Award 2 marks for each element correctly identified) | 8 | ||
| Appropriate formwork material selection for each element (4 elements x 4 marks) (Award 4 marks for each element with correct formwork material selected) | 16 | ||
| Overall neatness and organization of samples and selections (Award up to 3 marks for neat and professional presentation) | 3 | ||
| Sub-Total | 27 | ||
| GRAND TOTAL | 60 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
Sample simulation — try how the simulator works. A version built for this chapter's practical is coming.
Prepare Kenyan PilauLocked ▸Free: practical guides, quick cards, workplace scenarios and more.
Now — are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.