Chapter 2: Set-out building
📚 8 Topics

Set-out building is a critical preliminary stage in masonry works where the foundation for accurate construction is established. In Kenya, whether constructing a county government office in Kisumu or expanding a university lecture hall in Eldoret, precise set-out ensures the building’s dimensions and layout conform to design specifications. This stage demands the use of proper personal protective equipment and specialized tools to safeguard workers and guarantee measurement accuracy. Mastery of these essentials promotes efficiency and safety across diverse sectors such as healthcare facilities, retail outlets, and agricultural warehouses.

2.1 PPEs

2.1.1 Types of PPE

Understanding the various types of PPE used in masonry set-out is fundamental for effective protection. Each type has specific features tailored to particular risks encountered during site layout.

Head Protection

Hard hats or helmets protect workers from head injuries caused by falling objects or accidental impacts with set-out tools. For example, workers laying out foundations at a county government office in Nakuru rely on helmets to prevent serious injury from overhead hazards.

Hard hats or helmets
Hard hats or helmets (Source: 07e9615ca40d9de2)

Eye Protection

Safety goggles or glasses shield the eyes from dust, cement particles, and flying debris generated during marking and measuring activities. At a retail business construction site in Nairobi, eye protection is crucial to prevent irritation and long-term damage.

Safety goggles or glasses
Safety goggles or glasses (Source: PLUMBING THEORY NOTES-2)

Hand Protection

Gloves made from materials such as leather or rubber protect hands from cuts, abrasions, and chemical exposure. Workers setting out foundations at a university campus in Kisii use gloves to maintain grip and avoid injuries from sharp tools.

Leather and rubber gloves for construction
Leather and rubber gloves for construction (Source: 7e1ffd273fe140b1)

Foot Protection

Steel-toed boots provide resistance against heavy objects dropping on feet and prevent slips on uneven or wet surfaces. In agricultural warehouse construction in Eldoret, proper footwear is essential for navigating rough terrain safely.

Steel-toed boots construction site Kenya
Steel-toed boots construction site Kenya (Source: 07e9615ca40d9de2)

Respiratory Protection

Dust masks or respirators guard against inhalation of fine dust particles during layout marking, which may contain silica or other hazardous materials. For instance, workers at a hotel site in Mombasa wear masks when marking out in dusty conditions.

Dust masks respirators construction workers Kenya
Dust masks respirators construction workers Kenya (Source: 42af2528e15224c5)

2.1.2 Uses of PPE

The effective use of PPE reduces the incidence of occupational injuries and promotes compliance with safety regulations.

Prevention of Physical Injuries

Protection Against Environmental Hazards

Exposure to sun, dust, and chemicals is common on construction sites. PPE such as hats, masks, and sunscreen protect workers from heatstroke and respiratory issues, as seen in county hospital expansions in Nakuru.

Compliance with Safety Standards

Using PPE aligns with Kenya’s Occupational Safety and Health Act requirements, protecting both workers and employers from legal consequences. For example, county government offices enforce PPE compliance to avoid penalties and ensure worker welfare.

Enhancing Worker Confidence and Productivity

Knowing they are protected encourages workers to perform tasks efficiently without fear of injury. At a retail chain store construction in Nairobi, staff wearing appropriate PPE demonstrate higher morale and focus.

Reducing Absenteeism and Medical Costs

Proper PPE use minimizes workplace accidents, leading to fewer days lost and reduced medical expenses for organizations such as universities expanding their infrastructure in Kisii.

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Setting out tools and equipment's

Accurate building set-out depends on specialized tools and equipment that enable precise measurement and marking of construction points. These instruments are vital across Kenyan sectors from hospital construction in Eldoret to bank branch expansions in Nakuru…

🔒2.3 Setting out methods

Setting out is the critical process of transferring building designs from plans to the physical site, ensuring the structure is accurately positioned and aligned. In Kenya, precise setting out is essential for projects in diverse sectors such as county hospita…

🔒2.4 Profiling

Profiling is a technique used in construction to transfer the building’s layout vertically and horizontally from the set-out lines to guide the masons during wall construction. Profiling is crucial in multi-storey buildings and large structures such as univers…

🔒2.5 Levelling

Levelling is a fundamental activity in masonry works that ensures construction elements are built on correct horizontal planes. In Kenya, accurate levelling is critical for structures such as county referral hospitals and schools to maintain structural integri…

🔒2.6 Transferring Measurements to the Ground

Transferring measurements from building plans to the physical site is a critical step in setting out a building. This process ensures that the dimensions, positions, and levels of the foundation and walls correspond precisely to the approved architectural and…

🔒2.7 Setting out tools and equipment are maintained and stored based on manufacturer's instructions

In Kenyan construction and allied industries, proper maintenance and storage of setting out tools is critical to ensure accuracy, longevity, and safety. Whether in a county hospital constructing a new wing, a university expanding facilities, or a bank building…

🔒2.8 Over site excavation is carried out as per SOPs

Over site excavation forms the foundation for any masonry project, providing a stable base for the building structure. In Kenya, adherence to Standard Operating Procedures (SOPs) during excavation ensures safety, compliance with environmental regulations, and…

Chapter Summary

This chapter begins by examining personal protective equipment, detailing various types and their specific uses to ensure safety during masonry works. It then explores the essential setting out tools and equipment, highlighting their different forms and practical applications on site. The chapter proceeds to explain key setting out methods, including the 3-4-5 technique and the use of the builder's square for accurate layout. Profiling is covered with a focus on the role and setup of profile boards in marking building outlines. The process of levelling is addressed through the concept of surface levelling to establish a true horizontal reference. Techniques for transferring measurements accurately to the ground are also discussed to maintain precision. Proper maintenance and storage of setting out tools according to manufacturer guidelines are emphasized to preserve their functionality. Finally, the chapter covers the procedures for over site excavation, underscoring the importance of following standard operating procedures to prepare the foundation area correctly.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Identify five types of personal protective equipment (PPE) commonly used during building set-out and explain their primary uses. (10 marks)
  2. What is the purpose of a builder’s square in setting out a building? (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with model answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Identify five types of personal protective equipment (PPE) commonly used in masonry works and explain their primary function. (4 marks)
  2. Describe two uses of a builder’s square in setting out building foundations. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Identify and Use PPE in Masonry Set-Out

Building Technology · Level 5
Masonry Works
PRACTICAL ASSESSMENT
TIME: 3 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Identify and correctly wear all appropriate PPE before commencing masonry set-out for a 3m x 3m foundation layout.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Builders lineDust coat/Overall
Tape measureSafety boots
Plumb bobSafety helmet
Mason's squareProtective gloves
Safety goggles
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Dust coat/Overall1 Pc per Candidate
2Safety boots1 Pair per Candidate
3Safety helmet1 Pc per Candidate
4Protective gloves1 Pair per Candidate
5Safety goggles1 Pair per Candidate
6Builders line1 Pc per Candidate
7Tape measure (5m)1 Pc per Candidate
8Plumb bob1 Pc per Candidate
9Mason's square1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PPE Identification and Usage
Candidate correctly selects and dons dust coat/overall
(Award 1 mark for correctly worn dust coat/overall or zero)
1
Candidate correctly wears safety boots
(Award 1 mark for correctly worn safety boots or zero)
1
Candidate correctly wears safety helmet
(Award 1 mark for correctly worn safety helmet or zero)
1
Candidate correctly wears protective gloves
(Award 1 mark for correctly worn gloves or zero)
1
Candidate correctly wears safety goggles
(Award 1 mark for correctly worn safety goggles or zero)
1
Candidate inspects PPE for damage and fit before use
(Award 1 mark for proper inspection or zero)
1
Candidate handles and stores PPE safely after use
(Award 1 mark for proper handling and storage or zero)
1
Sub-Total7
TASK 2: Masonry Set-Out Preparation with PPE
Candidate clears the working area safely while wearing PPE
(Award 1 mark for clearing area safely or zero)
1
Candidate selects and assembles masonry set-out tools using PPE
(Award 1 mark for correct tool assembly or zero)
1
Candidate uses builders line, tape measure, plumb bob, and mason's square correctly while wearing PPE
(Award 2 marks for correct tool usage with PPE or zero)
2
Sub-Total4
PRODUCT CHECKLIST
Candidate wears all required PPE correctly throughout the masonry set-out task
(Award 1 mark for each correctly worn PPE during the task, total 5 marks)
5
PPE condition is good, clean, and undamaged
(Award 3 marks for PPE in good condition or zero)
3
Working area is safe and free from hazards due to correct PPE use
(Award 3 marks for safe working environment maintained by PPE use or zero)
3
Sub-Total11
GRAND TOTAL22
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Select and Demonstrate Setting Out Tools for a 3m x 3m Building Layout

Building Technology · Level 5
Masonry Works
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Set out a 3m by 3m building foundation layout accurately using appropriate setting out tools as per standard practice.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Dust coat
Safety boots
Gloves
Tape measure
Builder's line
Plumb bob
Mason's square
Spirit level
Hammer
Pegs
Chalk line
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Dust coat1 pc per candidate
2Safety boots1 pair per candidate
3Gloves1 pair per candidate
4Tape measure (5 meters)1 pc per candidate
5Builder's line1 pc per candidate
6Plumb bob1 pc per candidate
7Mason's square1 pc per candidate
8Spirit level (600 mm)1 pc per candidate
9Hammer1 pc per 2 candidates
10Pegs (wooden)10 pcs per candidate
11Chalk line1 pc per 5 candidates
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and Use of Setting Out Tools
Wore PPE appropriately (dust coat, safety boots, gloves)
(Award 1 mark each for dust coat, safety boots, gloves)
3
Cleared and prepared working area for setting out
(Award 2 marks for clearing and preparing work area)
2
Selected correct setting out tools and equipment
(Award 1 mark each for tape measure, builder's line, plumb bob)
3
Measured and marked 3m x 3m layout on ground using tape measure and pegs
(Award 1 mark for each correct length and width marking and pegging)
4
Used mason's square to ensure corners are right angles
(Award 3 marks for correct use and confirmation of 90-degree angles at all corners)
3
Used plumb bob to mark vertical alignment points
(Award 2 marks for correct plumb bob use)
2
Used builder's line stretched between pegs for straight lines
(Award 3 marks for proper string line tension and straightness)
3
Checked horizontal level using spirit level along builder's line
(Award 3 marks for correct leveling technique)
3
Adjusted layout as necessary for accuracy
(Award 2 marks for making corrections and adjustments)
2
Conducted housekeeping by clearing tools and site after task
(Award 3 marks for proper cleaning and tool storage)
3
Sub-Total28
PRODUCT CHECKLIST
Layout dimensions 3000mm x 3000mm within ±10mm tolerance
(Award 2.5 marks each for length and width within tolerance)
5
All four corners are square (90 degrees) within tolerance
(Award 1 mark for each corner square)
4
Builder's line is taut and straight with no sagging
(Award 3 marks for taut and straight line)
3
Pegs properly driven and aligned vertically
(Award 3 marks for correct pegging and vertical alignment)
3
Spirit level readings confirm horizontal accuracy along layout
(Award 3 marks for correct leveling)
3
Overall neatness and completeness of the setting out
(Award up to 4 marks for neat and complete layout)
4
Sub-Total22
GRAND TOTAL50
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Set-out a right angle using the 3-4-5 method on sitePractical 3
🔒Use builder's square to mark out a 3m x 3m building foundation layoutPractical 4
🔒Erect and use profile boards to mark building lines and levels for a 4m x 3m foundation layoutPractical 5
🔒Surface Levelling of a 2m x 2m Area Using Spirit LevelPractical 6
🔒Set out building foundation layout on ground accuratelyPractical 7
🔒Maintain and store setting out tools as per manufacturer's instructionsPractical 8
🔒Carry out over site excavation for a building foundationPractical 9
🔒Set out building corners using combined 3-4-5 and builder's square methodsPractical 10
🔒Construct and Use Profile Boards for Level and Alignment ControlPractical 11
🔒Setting Out a Building Layout Using a Builder's SquarePractical 12
🔒Perform surface levelling and mark profile board heights for building set-outPractical 13
🔒Inspection, Maintenance and Storage of PPE and Setting Out ToolsPractical 14
🔒Plan and Execute Over Site Excavation with Safe Set-OutPractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 20 questions Start quiz ▾
0%
0 / 2
🔒

18 more in this section.

Create a free account